    ARC FLash and Short Circuit Coordination Study

    Hi all

    Can anybody guide me that what data need to be collected from Utility Side and for Each and every equipment in Substation for ARC FLASH and Short Circuit Coordination study and how to fill up the 1584 Sheet ?

    Regards

    Sami
    Reply to Post • 

  2. #2
  3. Join Date
    Apr 2017
    Posts
    5
    Reputation

    Utility

    Quote Originally Posted by mask1290 View Post
    Hi all

    Can anybody guide me that what data need to be collected from Utility Side and for Each and every equipment in Substation for ARC FLASH and Short Circuit Coordination study and how to fill up the 1584 Sheet ?

    Regards

    Sami
    You will have to write a letter and request from the Utility company their short circuit contribution on the electrical system.
    Reply to Post • 

Login or register to leave a reply!



Related Topics

  1. Here's why you should always short a CT secondary
    By SecondGen in forum Safety and Arc-Flash Talk
    Replies: 0
    Last Post: January 26, 2016, 09:27 AM
  2. Arc Flash Tables vs Arc Flash Studies
    By mnmurphy in forum Safety and Arc-Flash Talk
    Replies: 0
    Last Post: March 26, 2015, 09:40 PM
Search TestGuy
   Tag Cloud   Advanced Search
Follow us


Explore TestGuy


NETA Certification Training


Help and Support