Page 1 of 3 123 LastLast
Results 1 to 10 of 29

Cable hi-pot withstanding time, why 15 minutes?

    #1
  1. Join Date
    Jun 2015
    Posts
    7
    Reputation

    Cable hi-pot withstanding time, why 15 minutes?

    Hi everyone, in my instruction of cable hi-pot testing, the shield cable withstanding time is 15 minutes, un-shielded cable is 5 minutes.

    It is super boring to hipot a high voltage cable, (step up time plus 15 minutes withstanding time, about half hour per cable. could we reduce the withstanding time), could somebody please explain why it needs 15 minutes?

    Thank you.
    Reply to Post • 

  2. #2
  3. Join Date
    Dec 2014
    Posts
    84
    Reputation
    lol i second that! even more boring than transformer PI

    Quote Originally Posted by moon1958moon View Post
    It is super boring to hipot a hightvoltage cable, ( step on time plus 15 minutes withstanding time, about half houre per cable.
    Reply to Post • 

  4. #3
  5. Join Date
    Jun 2015
    Posts
    11
    Reputation
    Boring, agreed. Related to cable testing, Were you instructed to raise the test voltage in 5 steps to max voltage?
    Reply to Post • 

  6. #4
  7. Join Date
    Mar 2015
    Location
    Pittsburgh, PA
    Posts
    9
    Reputation

    Hi-Pot

    yes, 5 Steps.
    VLF testing cable is just as much fun.
    Reply to Post • 

  8. #5
  9. Join Date
    Jan 2015
    Posts
    7
    Reputation
    Normally we do an Insulation Resistance test before and after the 15 minute High Potential Test. I was wondering if this is standard or not? Thanks.
    Reply to Post • 

  10. #6
  11. Join Date
    Dec 2014
    Posts
    84
    Reputation
    Why would you need to do insulation resistance twice?

    Quote Originally Posted by Will Ward View Post
    Normally we do an Insulation Resistance test before and
    after the 15 minute High Potential Test...
    I was wondering if this is standard or not?
    Thanks
    Reply to Post • 

  12. #7
  13. Join Date
    Jun 2015
    Posts
    7
    Reputation
    how were your megger readings the second time did they get worse? just curious if, and how bad the high pot damaged the insulation of the cable...
    Reply to Post • 

  14. #8
  15. Join Date
    Jul 2015
    Posts
    4
    Reputation

    underbid the job??? haha

    Are you an owner or an hourly paid employee? haha

    Wait the 15min man and plot the readings that you take every minute. You'll see the trend of the results should reduce quickly in the beginning and then start to level out at the end of the 15min period. Almost like a wave.

    Sometimes we plot these on an excel file and submit them with the report. It's a good visual to show you weren't just making up numbers.
    Reply to Post • 

  16. #9
  17. Join Date
    Dec 2014
    Posts
    84
    Reputation
    tie all three cables together, do a gang test, and roll out early.
    Reply to Post • 

  18. #10
  19. Join Date
    Jun 2015
    Posts
    7
    Reputation

    MEGGER BEFORE HI-POT

    I NEED TO MEGGER BEFORE HI-POT. BUT NOT DO IT AGAIN AFTER HI-POT.

    THE LEAKAGE CURRENT WILL BE STABEL OFTER TEN MINUTES OFTER GOT THE WITHSTANDING VOLTAGE. SO I DON'T THINK I NEED 15 MINUTES WITHSTANDING TIME. SUPER BORRING.
    Reply to Post • 

Page 1 of 3 123 LastLast

Login or register to leave a reply!



Related Topics

  1. Time Domain Reflectometer
    By adamwilson in forum NETA Level 3 Exam
    Replies: 3
    Last Post: January 26, 2017, 08:51 AM
  2. Westinghouse DS-206 complete dis-assembly in less than 10 minutes
    By SecondGen in forum Electrical Testing Talk
    Replies: 1
    Last Post: December 29, 2015, 02:30 PM
  3. Cable hi-pot step voltage test
    By cjones09 in forum Electrical Testing Talk
    Replies: 1
    Last Post: August 25, 2015, 06:38 AM
  4. time current curves for fedral pacific circuit breakers
    By Herc8306 in forum Electrical Testing Talk
    Replies: 3
    Last Post: June 11, 2015, 06:52 PM
  5. Cable Insulation Precentage
    By CanTest in forum Electrical Testing Talk
    Replies: 1
    Last Post: June 24, 2014, 04:21 PM

Related Content

Tags for this Thread

Search TestGuy
   Tag Cloud   Advanced Search
Follow us


Explore TestGuy


NETA Certification Training


Help and Support